in Case StudiesMost mature offshore oil fields have extensive pipeline systems that have been in place since the assets were first developed, in many cases several decades ago. These pipelines may be inter-field gathering lines or pipelines between platforms. Ultimately, the product will need to be routed to shore via an export pipeline. Recent developments in exploration […]
Read MoreMonday, January 25th, 2016
in Case StudiesPigtek were awarded a contract in January 2003 by Esso Petroleum Company Ltd to provide pigs and pig tracking services on five 4in. Jetline pipelines. The pipelines required diversion works to enable civil engineering to continue as part of the Terminal 5 construction project at Heathrow International Airport. This required the pipelines to be de-commissioned […]
Read MoreMonday, January 25th, 2016
in Case Studies, Case StudiesPigtek were awarded a contract to design and supply a pig that would successfully traverse a 20in. pipeline with several challenging features, that included a 20in./24in. dual diameter tee section, 3D 180 degree bends and an asymmetrical wye piece. These were the parameters set by our client for Pigtek to deliver an efficient cleaning pig […]
Read MoreMonday, January 25th, 2016
in Case StudiesStatoil, the Norwegian oil and gas company, were partners in the Nam Con Son development in Vietnam. The development was for a 26in. x 362km gas pipeline from an offshore platform to the onshore terminal. The pipeline included an asymmetrical wye piece for a future field tie-in. The produced gas was expected to generate substantial […]