Dual Module Brush/Magnetic Cleaning Pig during trials

Case Study 2 – Pig Design, Verification Trials and Supply

Monday, January 25th, 2016

in Case Studies, Case Studies

Pigtek were awarded a contract to design and supply a pig that would successfully traverse a 20in. pipeline with several challenging features, that included a 20in./24in. dual diameter tee section, 3D 180 degree bends and an asymmetrical wye piece. These were the parameters set by our client for Pigtek to deliver an efficient cleaning pig […]