Pigtek have great experience in preparing pipelines
ready for smart or intelligent pigging surveys.
Correct preparation to remove debris from any pipeline
prior to a corrosion survey is essential. Careful planning and preparation
minimises the risk of a smart or intelligent pig becoming stuck and the quality
of data being degraded due to sensor damage or sensor lift off. The cost of a
re-run can be very expensive whilst the consequences of a smart or intelligent
pig becoming stuck can be catastrophic.
Depending on the age, condition and history of a pipeline, we can
provide full proving, gauging and cleaning services. Pigtek adopt a very
progressive approach to pre-inspection cleaning to minimise the risk of a pig
becoming stuck, or the pipeline becoming blocked due to a build up of too much
debris being removed too soon.
The progressive stages of our proving, gauging and cleaning operation
are typically as follows:
| Stage
1 |
|
Pipeline Proving and Gauging |
| |
|
|
| Stage
2 |
|
Initial Pipeline Cleaning |
| |
|
Loose Debris
Removal |
| |
|
Liquid
Removal |
| |
|
|
| Stage
3 |
|
Advanced Cleaning |
| |
|
Ferrous Debris
Removal |
| |
|
Hard Deposit
Removal |
|



 |
|
|
|
|
|
|
|